Description | TIF funds used for site preparation, grading and erosion control, silt fence installation, clearing and grubbing, site excavation, tree demolition, site embankment, utilities (water, sewer, and electrical), on site pavement, landscaping and irrigation, fencing, parking lot lighting, and other public improvements related to the same needed in the construction of four buildings, totally 20,400 square foot . The facility is designed as an industrial flex building with the ability to be either for warehouse storage or a service bay. The facility will include twenty bays total with the potential for ten plus bays used for potential trade service business. |