TIF ID | 59-9582 |
Taxes refunded | $63,552.58 |
Taxes paid | $11,648.51 |
County Name | MADISON |
County Number | 59 |
TIF Name | TIF MCINTOSH FAM LLC REDEV PLAN PHASE 2; SUB-PH 3 |
Project Date | 01/01/2021 |
City Name | NORFOLK |
School District | NORFOLK 2 |
Base School | 59-0002 |
Unified LC | |
Class | 3 |
Name | MCINTOSH FAM LLC REDEV PLAN PHASE 2; SUB-PH 3 |
Location | Lots 6A and 6B Block 2 Meadow Ridge Phase IV 3rd Add; Lots 6A and 6B Block 3 Meadow Ridge Phase VI 3rd; Lots 7A and 7B Block 3 Meadow Ridge Phase VI 3rd Addition; and Lots 8A and 8B Bock 3 Meadow Ridge Phase VI 3rd Addition; PID's 590254935, 590254943, 590254967, 590254975, 590254983, 590254991, 590254999, and 590255007 |
Description | TIF funds used for constructing access to Benjamin Avenue, construct adequate water and sewer systems and merge into exisiting systems, site preparation including fill and grading of the site, construction of public streets to access the lots in the project, electrical infrastructure construction costs and fees associated with approximately 53 single family attached and detached housing units. |